1. The whole process of product design, manufacture
and test is controlled by ISO9002 quality assurance
system. Unqualified products will never leave the
factory.
2. All impeller and rotor parts shall be tested for
dynamic balance. Single casting pressure test.
3. The spare parts of the product have universality and
interchangeability, and are designed and manufactured according to national standards
1. The warranty period is 12 months after the equipment is handed over to production after 168 hours of trial operation. The warranty period is "three guarantees".
2. Assign technicians on site to guide installation and debugging free of charge and ensure the normal
operation of equipment.
3. Technical training for operators.
4. Handling of quality faults: if quality problems are
found in the operation of the equipment, reply immediately after receiving the information and arrive at the site within 0-36 hours to deal with them until they are solved.
|